Construction and Equipment Division
All offers must be submitted in writing per the solicitation. You must print the solicitation out and send in a written offer. No electronic offers can be accepted at this time. Copies of the Plans, Drawings and Amendments will be available on this Web Site.
The documents provided on this site will require software to be installed on your computer. Following are links to the software and must be downloaded and installed before you can view the documents. Adobe Acrobat Reader enables bidders to view and utilize all text-based documents. Autodesk Express Viewer is used for graphic documents (drawings).
To download the Adobe Acrobat Reader software click here: Download Adobe Free Reader Software and follow the download instructions.
To download the Autodesk Express Viewer software click here: http://usa.autodesk.com/adsk/servlet/index?siteID=123112&id=2404513. Complete user information and press "Get Autodesk express viewer". After downloading the viewer, return to this site to download the Plans and Drawings.
To obtain an electronic copy of the solicitation documents click the REQUEST Link for a Project after viewing the Plans/Drawings (Exhibit B) and Specifications (Exhibit C). Follow the instructions.
Current Construction Solicitations
To view Plans/Drawings and Specifications or request documents, click the Solicitation Number below.
Please Note: Solicitations will be removed from webpage within 1 week after the due date. A letter will be sent to all bidders advising of the outcome of the solicitation.
| Solicitation Number: | AAFES-REZC-07-082-08-092 |
| Title: | Convert to Manchu Wok |
| Location: | Ft. Bragg, NC |
| Value Range: | $100,00 to $200,000 |
| Construction Period: | 90 DAYS |
| Due Date: | 07 October 2008: 2PM |
| Synopsis: |
Renovation to a existing Baskin Robins and Blimpies Tenant Food Concept to a 657s.f. Manchu WOK Express. The work to be performed in connection with this project includes, but is not limited to the following: Demolition of existing portion of the roof to accommodate new rooftop equipment, removal of plumbing fixtures, wall mounted accessories, suspended acoustical ceiling systems, wall finishes, mechanical ductwork, diffusers, signage and acoustical lighting |
| Amendments: | One, Addendum One, Attachments One - Five, Two with Attachment One |
| Contracting Officer: | Robert Wallis (Tel#214-312-3219) wallisr@aafes.com |
| Solicitation Number: | AAFES-REZC-08-025-08-045- CANCELED |
| Title: | Install Canopy Ceiling at Shoppette |
| Location: | Ft Buchanan, PR |
| Value Range: | $25,000 TO 75,000 |
| Construction Period: | 45 DAYS |
| Due Date: | 29 Aug 2008: 2PM |
| Synopsis: |
Relocate and reinstall light fixtures per drawing and specifications. Technical questions shall be faxed to the contracting officer at 214-465-2139 10 days prior to the due date. |
| Amendments: | None |
| Contracting Officer: | Kim Bevering (Tel#214-312-4831) |
| Solicitation Number: | AAFES-REZC-04-005-08-089 |
| Title: | Retail Store/ODL |
| Location: | Ft Huachuca, AZ |
| Value Range: | $500,000 TO $1 Million |
| Construction Period: | 150 DAYS |
| Due Date: | 21 Oct 2008: 2PM |
| Synopsis: |
This project is the Building No. 52048, 5,963 sq. ft. with three exterior walls to create an interior retail sales/mpa and renovates/upgrades 6,040 sq. ft. of existing retail store. The scope of work includes demolition of the existing exterior load bearing wall to open the existing store into the new enclosed retail sales floor, new interior walls, ceilings, new floor finishes, new service counters, new lighting, new HVAC for the expansion, and install AAFES provided sales fixtures, equipment and utility support as scheduled. Provide mechanical and electrical equipment as required. Install concept signage as specified. |
| Amendments: | Amendment #1 |
| Contracting Officer: | Judy James (Tel#214-312-6996) |
| Solicitation Number: | AAFES-REZC-04-005-08-088 |
| Title: | Upgrade Existing Food Court |
| Location: | Ft Huachuca, AZ |
| Value Range: | $500,000 TO $1 Million |
| Construction Period: | 150 DAYS |
| Due Date: | 23 Oct 2008: 2PM |
| Synopsis: |
T his project upgrades the existing Food Court in Building 52030 (aprox. 2,040 SF). Activate a Starbucks and Manchu Wok and relocate and update the Anthony's Pizza and Robin Hood. Add new dining expansion of 1,460 sq. ft. to the existing dining. Replace ceiling and light fixtures. Upgrade mechanical and plumbing systems. Install kitchen equipment and fixtures. Add new HVAC for dining addition. Provide new interior finishes and signage. |
| Amendments: | Amendment #1 |
| Contracting Officer: | Judy James (Tel#214-312-6996) |
| Solicitation Number: | AAFES-REZC-04-005-08-097 |
| Title: | Taco Bell |
| Location: | Nellis AFB, NV |
| Value Range: | $200,000 TO $500,000 |
| Construction Period: | 60 DAYS |
| Due Date: | 22 Oct 2008: 2PM |
| Synopsis: |
This project will replace the existing Taco John with a Taco Bell. |
| Amendments: | Amendment #1, Amendment #2 |
| Contracting Officer: | Judy James (Tel#214-312-6996) |
| Solicitation Number: | AAFES-REZC-03-033-08-025 |
| Title: | CONSTRUCT SHOPPETTE |
| Location: | LUKE AFB, AZ |
| Value Range: | $5 MILLION TO $7.5 MILLION |
| Construction Period: | 365 DAYS |
| Due Date: | 12 SEPTEMBER 2008: 2PM |
| Synopsis: |
This project will include the construction of a New Shoppette with Class Six, Gas, Name Brand Fast Food, (3) Three Bay Car Care Center and (1) One Bay Carwash. The Shoppette/Burger King/Car Care is Approximately 19,000 sf with (8) MPD's and the (1) One Bay Carwash in approximately 1000 sf. |
| Amendments: | ONE, TWO, THREE, FOUR |
| Contracting Officer: | Sing Poon (Tel#214-312-6981) |