| Lot Size |
Sample
Size |
Acc |
Rej |
Criteria for Continuing
Inspection |
| 1 - 8 |
All |
* |
* |
N/A |
91 - 150
(Cumulative S/S) |
8
20 |
0
1 |
2
2 |
If 1 defective found, go to
S/S of 20. ** |
151 - 280
(Cumulative S/S) |
20
32 |
0
1 |
2
2 |
If 1 defective found, go to
S/S of 32. |
281 - 500
(Cumulative S/S) |
20
50 |
1
2 |
3
3 |
If 2 defectives found, go to
S/S of 50. |
501 - 1200
(Cumulative S/S) |
32
80 |
1
3 |
4
4 |
If 2 - 3 defectives found,
go to S/S of 80 |
1201 - 3200
(Cumulative S/S) |
50
125 |
2
5 |
6
6 |
If 3 - 5 defectives found,
go to S/S of 125 |
3201 - 10,000
(Cumulative S/S) |
80
200 |
3
8 |
9
9 |
If 4 - 8 defectives found,
go to S/S of 200 |
10,001 - 35,000
(Cumulative S/S) |
125
315 |
5
12 |
13
13 |
If 6 - 12 defectives found.
go to S/S of 315 |
Over 35,000
(Cumulative S/S) |
200
500 |
8
18 |
19
19 |
If 9 - 18 defectives found.
go to S/S of 500 |