| Lot Size |
Sample
Size |
Acc |
Rej |
Criteria for Continuing
Inspection |
| 1 - 8 |
All |
* |
* |
N/A |
9 - 25
(Cumulative S/S) |
3
8 |
0
1 |
2
2 |
If 1 defective found, go to
S/S of 8. |
| 26 - 90 |
13 |
2 |
3 |
N/A. |
91 - 150
(Cumulative S/S) |
13
20 |
1
3 |
4
4 |
If 2 - 3 defective found, go
to S/S of 20. |
151 - 280
(Cumulative S/S) |
13
32 |
1
5 |
6
6 |
If 2 - 5 defectives found,
go to S/S of 32. |
281 - 500
(Cumulative S/S) |
20
50 |
2
7 |
8
8 |
If 3 - 7 defectives found,
go to S/S of 50. |
501 - 1200
(Cumulative S/S) |
32
80 |
3
10 |
11
11 |
If 4 - 10 defectives found,
go to S/S of 80 |
1201 - 3200
(Cumulative S/S) |
50
125 |
5
14 |
15
15 |
If 6 - 14 defectives found,
go to S/S of 125 |
3201 - 10,000
(Cumulative S/S) |
80
200 |
8
21 |
22
22 |
If 9 - 21 defectives found,
go to S/S of 200 |
10,001 - 35,000
(Cumulative S/S) |
125
200 |
12
21 |
22
22 |
If 13 - 21 defectives found.
go to S/S of 200 |
Over 35,000
|
200 |
21 |
22 |
N/A |